• About
  • Subscribe
  • Advertise
  • Contact
Friday, November 7, 2025
Newsletter
SUBSCRIBE
  • News
    • Americas
    • Europe
    • Rest of World
  • Products
  • Features
  • Categories
    • Ancillary Equipment
    • Asphalt Plants, Equipment & Applications
    • Auctions, Used Equipment, Rental & Finance
    • Breaking, Drilling & Blasting
    • Concrete Plants, Equipment & Applications
    • Crushing Static & Mobile
    • Dewatering Pumps
    • Loading, Hauling & Excavation
    • Quarry Products
    • Screening Static & Mobile
    • Washing & Water Management
    • Wear Parts & Maintenance
  • Latest Magazine
  • Events
  • Videos
No Results
View All Results
  • News
    • Americas
    • Europe
    • Rest of World
  • Products
  • Features
  • Categories
    • Ancillary Equipment
    • Asphalt Plants, Equipment & Applications
    • Auctions, Used Equipment, Rental & Finance
    • Breaking, Drilling & Blasting
    • Concrete Plants, Equipment & Applications
    • Crushing Static & Mobile
    • Dewatering Pumps
    • Loading, Hauling & Excavation
    • Quarry Products
    • Screening Static & Mobile
    • Washing & Water Management
    • Wear Parts & Maintenance
  • Latest Magazine
  • Events
  • Videos
No Results
View All Results
Home News CEMEX low carbon solutions for the spectacular architecture of Paris Duo Towers

CEMEX low carbon solutions for the spectacular architecture of Paris Duo Towers

by Guy Woodford
July 29, 2021
in Europe, News
Reading Time: 2 mins read
A A
Share on FacebookShare on Twitter

CEMEX has helped to overcome exceptional structural constraints during the completion of the Duo towers in Paris, designed by eminent architect Ateliers Jean Nouvel and built by VINCI subsidiary Bateg over three years.

The towers reach 180m high and 39 floors for the first, and 125m and 28 floors for the second. CEMEX delivered more than 40,000m3 of concrete for this impressive achievement, including low carbon formulations, and removed 42,000 tonnes or spoil materials via its multimodal transport network.

These multi-use skyscrapers presented huge technical challenges to the construction team as they are inclined at an angle of 5° (more than the leaning tower of Pisa) and were built on a very narrow site. The foundations, diaphragm walls and nine basement levels required specialist concrete to enable long six-hour pours and high-quality facings.

Of the 40,000m3 of ready-mixed concrete supplied from local CEMEX units, 25% was for concrete foundations for diaphragm walls, and 75% for civil engineering and architectural concrete for elevations. The client also required high-performance concrete for pouring a mega-beam supporting all the towers and with an integrated cooling system. The latter was designed and delivered by the Paris Port-Victor production unit. All the concrete was designed with formulations to reduce the building’s carbon footprint, particularly for the foundations.

In 2021, 150m3 of black decorative concrete was pumped to construct the terraces of the two towers, while fast-drying anhydrite screed was installed on nearly 2,000m² of heated floors. In addition, during these three years, thanks to its robust multimodal logistics system, CEMEX will have evacuated almost all of the spoil – nearly 42,000 tonnes.

The strong commitment of CEMEX’s technical teams ensured the success of the operation. For a complex project like this, excellent communication between the various CEMEX departments (commercial, technical, production) and the concrete manufacturing teams enabled smooth and consistent concrete deliveries during long days and weekends.

Related Posts

Quarry Life Award winners and runners up receive awards at Heidelberg Materials head office in Maidenhead. Image/Heidelberg Materials UK

Heidelberg Materials UK biodiversity award winners revealed

by Guy Woodford
November 7, 2025

Heidelberg Materials UK has announced the winners of its sixth Quarry Life Award, with projects at its Horton quarry in...

A Liebherr crawler excavator crushes rocks, while the anniversary machine transports the material. Image/Liebherr

Liebherr’s 10,000th XPower wheeled loader joins BERGER’s fleet

by Guy Woodford
November 7, 2025

The 10,000th Liebherr XPower wheeled loader is now hard at work in the Schlag granite quarry operated by BERGER Rohstoffe...

The NPC pile croppers are easily mounted on and used by excavators, facilitating flexible production essential at large sites such as the under construction Holcim UK Tilbury cement terminal. Image/Careys-NPC

Careys completes work on new Holcim UK cement facility

by Guy Woodford
November 7, 2025

Working on behalf of Holcim UK, a Careys team has completed works on a new cement manufacturing and distribution facility...

Read our magazine

Join our newsletter

Aggregates Business is the go-to source for all of your up-to-date news and views on the European, American, Asian, African and Middle Eastern aggregates and linked building materials sectors.

Subscribe to our newsletter

About us

  • About
  • Advertise
  • Subscribe
  • Latest Magazine
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
    • Americas
    • Europe
    • Rest of World
  • Features
  • Products
  • Events
  • Videos

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
    • Americas
    • Europe
    • Rest of World
  • Products
  • Features
  • Categories
    • Ancillary Equipment
    • Asphalt Plants, Equipment & Applications
    • Auctions, Used Equipment, Rental & Finance
    • Breaking, Drilling & Blasting
    • Concrete Plants, Equipment & Applications
    • Crushing Static & Mobile
    • Dewatering Pumps
    • Loading, Hauling & Excavation
    • Quarry Products
    • Screening Static & Mobile
    • Washing & Water Management
    • Wear Parts & Maintenance
  • Latest Magazine
  • Events
  • Videos
  • About
  • Advertise
  • Subscribe
  • Contact

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited