• About
  • Subscribe
  • Advertise
  • Contact
Sunday, July 12, 2026
Newsletter
SUBSCRIBE
  • News
    • Americas
    • Europe
    • Rest of World
  • Products
  • Features
  • Categories
    • Ancillary Equipment
    • Asphalt Plants, Equipment & Applications
    • Auctions, Used Equipment, Rental & Finance
    • Breaking, Drilling & Blasting
    • Concrete Plants, Equipment & Applications
    • Crushing Static & Mobile
    • Dewatering Pumps
    • Loading, Hauling & Excavation
    • Quarry Products
    • Screening Static & Mobile
    • Washing & Water Management
    • Wear Parts & Maintenance
  • Latest Magazine
  • Events
  • Videos
No Results
View All Results
  • News
    • Americas
    • Europe
    • Rest of World
  • Products
  • Features
  • Categories
    • Ancillary Equipment
    • Asphalt Plants, Equipment & Applications
    • Auctions, Used Equipment, Rental & Finance
    • Breaking, Drilling & Blasting
    • Concrete Plants, Equipment & Applications
    • Crushing Static & Mobile
    • Dewatering Pumps
    • Loading, Hauling & Excavation
    • Quarry Products
    • Screening Static & Mobile
    • Washing & Water Management
    • Wear Parts & Maintenance
  • Latest Magazine
  • Events
  • Videos
No Results
View All Results
Home Features Hot on hot asphalt boosts productivity

Hot on hot asphalt boosts productivity

by Staff Writer
March 8, 2012
in Features
Reading Time: 2 mins read
A A
Share on FacebookShare on Twitter

Applying two layers of asphalt in one go not only improves quality, it also speeds up work on site - a critical factor during recent work on the A99 motorway near Munich in Germany. When traffic levels are at a high volume, road reconstruction work can often only be carried out at night leaving just a short time for resurfacing. But time is not the only pressure - these works need to be completed to a high standard in order to cope with the heavy loading.

Applying two layers of asphalt in one go not only improves quality, it also speeds up work on site – a critical factor during recent work on the A99 motorway near Munich in Germany

 When traffic levels are at a high volume, road reconstruction work can often only be carried out at night leaving just a short time for resurfacing. But time is not the only pressure – these works need to be completed to a high standard in order to cope with the heavy loading.

This was exactly the challenge facing Max Streicher during the recent rehabilitation of part of the A99 orbital motorway near Munich, which regularly carries 120,000 cars each day. The contactor was placed in charge of work on the Allach Tunnel and opted to use the ‘hot on hot’ dual asphalt paving approach to save time and ensure a performance finish.

 During the first night Streicher’s team used two Wirtgen milling machines to remove the road surface to a depth of 70mm before it was covered by a 55mm binder course on the second night. Light for this night time work was provided by 30 light balloons.

Once these preparations were completed, the new noise-reducing wearing course could be paved in the final night. On this job site, four Voegele Super 1800-2 with SprayJet Module worked in echelon ‘hot to hot’. They applied the bitumen emulsion type C67BP5-DSH-V and, at the same time, placed a 15mm wearing course of asphalt type DSH-V 5.

“The road had to be opened to traffic at five o’clock every morning, sufficiently cooled, with road markings applied,” explained site manager Tobias Feigl. This was a key factor in the company’s selection of the new equipment for the contract. According to Voegele, the SprayJet method is a fast procedure and is further fast tracked by use of the pavers in echelon and applying both layers of material in one operation.

“Inside the tunnel, three pavers worked in echelon, with the fourth joining them after the tunnel,” explained Fleigl. “What’s more, there was a slight crown had to be paved at the bifurcation of the two carriageways.” But according to Fleigl, the ‘hot on hot’ operation across varying pave widths and different grades presented no problems at all for the paving teams and their machines. “The initial nervousness of the teams quickly disappeared. Everyone involved in the job was relaxed and in a good mood, despite working at night,” he said.

Tags: Quarry Products

Related Posts

The Cemex UK Dove Holes building products facility near Buxton, Derbyshire. Image: Cemex UK

Cemex UK: Leadership in an era of big industry change

by Liam Mcloughlin
July 7, 2026

Over the past 12 to 18 months, Lex Russell has been leading Cemex UK through a period of meaningful transformation...

Screening

Crushing and screening prove critical to quarrying production

by Adam Daunt
June 23, 2026

Crushing and screening equipment plays a crucial role in the quarrying industry, influencing product quality, site efficiency, and overall productivity....

General Materials, Inc. has been a long-time customer of McLanahan. Image: McLanahan

McLanahan unlocks new horizons in the US market

by Adam Daunt
June 23, 2026

General Materials Inc has seen its production go to new levels after investing in new solutions from McLanahan. General Materials...

Read our magazine

Join our newsletter

Aggregates Business is the go-to source for all of your up-to-date news and views on the European, American, Asian, African and Middle Eastern aggregates and linked building materials sectors.

Subscribe to our newsletter

About us

  • About
  • Advertise
  • Subscribe
  • Latest Magazine
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
    • Americas
    • Europe
    • Rest of World
  • Features
  • Products
  • Events
  • Videos

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
    • News
    • Americas
    • Europe
    • Rest of World
  • Products
  • Features
  • Categories
    • Ancillary Equipment
    • Asphalt Plants, Equipment & Applications
    • Auctions, Used Equipment, Rental & Finance
    • Breaking, Drilling & Blasting
    • Concrete Plants, Equipment & Applications
    • Crushing Static & Mobile
    • Dewatering Pumps
    • Loading, Hauling & Excavation
    • Quarry Products
    • Screening Static & Mobile
    • Washing & Water Management
    • Wear Parts & Maintenance
  • Latest Magazine
  • Events
  • Videos
  • About
  • Advertise
  • Subscribe
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited