• About
  • Subscribe
  • Advertise
  • Contact
Saturday, January 17, 2026
Newsletter
SUBSCRIBE
  • News
    • Americas
    • Europe
    • Rest of World
  • Products
  • Features
  • Categories
    • Ancillary Equipment
    • Asphalt Plants, Equipment & Applications
    • Auctions, Used Equipment, Rental & Finance
    • Breaking, Drilling & Blasting
    • Concrete Plants, Equipment & Applications
    • Crushing Static & Mobile
    • Dewatering Pumps
    • Loading, Hauling & Excavation
    • Quarry Products
    • Screening Static & Mobile
    • Washing & Water Management
    • Wear Parts & Maintenance
  • Latest Magazine
  • Events
  • Videos
No Results
View All Results
  • News
    • Americas
    • Europe
    • Rest of World
  • Products
  • Features
  • Categories
    • Ancillary Equipment
    • Asphalt Plants, Equipment & Applications
    • Auctions, Used Equipment, Rental & Finance
    • Breaking, Drilling & Blasting
    • Concrete Plants, Equipment & Applications
    • Crushing Static & Mobile
    • Dewatering Pumps
    • Loading, Hauling & Excavation
    • Quarry Products
    • Screening Static & Mobile
    • Washing & Water Management
    • Wear Parts & Maintenance
  • Latest Magazine
  • Events
  • Videos
No Results
View All Results
Home News RST Solutions solves critical road build issue for new Australian mine

RST Solutions solves critical road build issue for new Australian mine

by Guy Woodford
September 4, 2023
in News, Rest of World
Reading Time: 6 mins read
A A
RST Solutions' advanced road stabilising technologies are proving invaluable in Australia. Pic: RST Solutions

RST Solutions' advanced road stabilising technologies are proving invaluable in Australia. Pic: RST Solutions

Share on FacebookShare on Twitter

A challenging road construction project for a new Australian mine has successfully used advanced road stabilising technologies by Reynolds Soil Technologies (RST Solutions) to build high-performing roads in remote areas, saving the mine significant resources.

Thirty-four kilometres of roads at a new mine, the Thunderbird Mineral Sands Project, being developed by Kimberley Mineral Sands (KMS) in the Kimberley region of northern Western Australia, have been constructed using RST Solutions’ advanced road construction technologies to withstand extreme heat and humidity.

Located on the Dampier Peninsula between Derby and Broome, the Thunderbird Project has progressed from an exploration project to a substantial mining project of one of the world’s largest and highest-grade mineral sands deposits, operated by KMS to mine minerals, including ilmenite, leucoxene and rutile for making titanium and zircon for specialty applications including water and air purifiers.

Temperatures rising to 50 degrees at the mine site and another major issue of red Pindan soils, known for being soft and moisture sensitive with high potential for collapse, challenged KMS senior project engineer Claudio Marone to take a new approach when designing the 30km haul road and 4km of service roads around the mine.

Marone’s original plan was to seal the roads with a chipseal bitumen. However, the extreme heat and humidity could have caused it to bubble and peel off, leaving sharper, harder holes requiring specialist contractors to repair.

“The constructed Pindan subgrade was overlayed by a sub-base/ base course layer constructed with crushed rock (compliant with Main Roads Western Australia); during heavy rain events, the layer was soaking and road trains routing it, thus every time we had to grade it,” Marone said.

“I was looking at alternative methods to seal the roads at Thunderbird because of the hot, humid conditions, and it was suggested I try a polymer soil stabiliser to strengthen the base course layer instead of putting down a top seal.

“After extensive research and consultant reviews, we visited the top companies specialising in polymer stabilisers and decided to go with RST Solutions because of their success with similar projects and the wealth of knowledge and experience they have from working in this field for 30 years. They really know what they are doing.”

RST Solutions

RST Solutions prescribed advanced soil stabiliser Titan for the Thunderbird Project, designed specifically for crushed rock road bases with no plasticity to achieve greater compaction levels. Titan was applied to the base course layer in specific doses mixed in through a stabiliser machine to control the moisture ready for compaction to form high-quality roads in a third of the time and a fraction of the cost, replacing the need for a typical top seal.

When the mine’s haul road opened and fully loaded triple road trains started to cart material from the site, the road surface was reported as “like cement stabilisation,” with the road responding well to the first 80mm of rain.

Marone said the road remained in excellent condition after heavy traffic use during rain, with no tyre depression noted and no marks on the road a week later when dry. Previously, in the same wet conditions, the road trains were routing the base course formation and the construction team was required to perform maintenance grading post-rain events.

“The benefits of taking this approach have been outstanding. We saved millions of dollars and now have flexible, weather-resistant roads with excellent dust control utilising an additional product RST Solutions suggested (Guardian) that will be a whole lot easier to maintain. Titan is comparable to cement stabilisation and replaced the need for a rigid top seal, enabling our team to carry out all the earthworks and finish off the roads without having to bring in a specialised team and their machinery to lay the chipseal. The ongoing maintenance for us now is less risky, more cost-effective and a lot easier to carry out with the equipment we already have on-site,” Marone added.

Haul roads need to be in excellent condition to support road trains carting high volumes of mined product from the site 24/7. RST Solutions is advancing road construction methods to assist civil engineers in achieving high-performing roads in areas with unique and challenging characteristics, such as intense temperatures, high rainfall and prolonged dry seasons.

The issues of extreme heat and humidity, dust and erosion control, and Pindan and other red soils at Thunderbird Project were addressed by RST Solutions with the company’s advanced soil stabiliser Titan for constructing high-performing flexible roads that are resilient to extreme conditions, including flooding and high volumes of heavy vehicle traffic.

Titan was further tailored by RST Solutions for compatibility with the Thunderbird site, with advised dosage levels significantly improving the top base course layer, increasing thickness and flexibility to achieve the required CBR (California Bearing Ratio).

“A wide variety of factors need to be considered when building in areas with extreme weather and unique topographical conditions,” RST Solutions business development manager Mark Farmer said.

“Engineers designing roads could be working with anything from red soils in areas prone to intense heat and humidity to silt and mud in some of the coldest, wettest parts of the world. Every location we work with is different and requires a unique and targeted approach to stabilisation and dust control.

“The key issues we have been assisting with on the Thunderbird Project are extreme weather conditions and the remote location of the site. Titan improves the binding of the crushed rocks forming the Road Base layer, reducing water permeation through the layer.

“Instead of deteriorating over time or washing away, Titan works down through the road’s surface layers when it rains, tightening up road structure through particle slippage and aggregation to lower roll resistance and improve road quality, reducing road maintenance and road recovery time.”

Adapting the road construction processes for compatibility to local conditions at the Thunderbird Project saved KMS a significant amount of resources, reducing construction costs by removing the expense of contracting a specialised team and their machinery to apply a chip seal. Furthermore, the future maintenance or repairs of the base course layer will be more cost-effective.

Results achieved on the 30km haul road and across 4km of minor roads around the mine include high water resistance and significantly improved physical properties, including packing density, elastic modulus, hardness, cohesion and fracture toughness to improve the whole road construction process, achieving more durable, weather-resistant roads and pavements that keep productivity at optimum.

With three decades of experience developing tailored solutions for the many fine particle challenges presented across numerous industries, processes and material types, RST Solutions solves complex site-specific issues caused by all types of fine particle issues for companies seeking more project optimisation strategies on a range of projects. RST Solutions adjusts the chemistry of its advanced technologies to target specific materials being used on-site and construction processes, a site’s application equipment and systems, local weather patterns and budget perimeters.

RST Solutions is an Australian business operating internationally, with presence and projects in Australia, North and South America, Africa, the Middle East, Asia and the Pacific. For more information, contact RST Solutions on (+61 7) 5522 0244 or visit www.rstsolutions.com.au.

Tags: Ancillary Equipment

Related Posts

The update features a quieter ADT cab environment, combined with effective climate control. Image: Develon

Develon introduces updated ADT cab

by Liam Mcloughlin
January 16, 2026

Develon has enhanced its articulated dump truck (ADT) range with an updated cab designed to maximise operator comfort, productivity and...

The Earthmoving sector has been the centrepiece of the SaMoTer for over sixty years, and this year features the return of Volvo CE. Image: Veronafiere/SaMoTer

Major global brands lined up for SaMoTer 2026

by Liam Mcloughlin
January 16, 2026

The main brands in the sector are all set to attend the SaMoTer international construction and quarrying equipment trade show...

Pronto

Heidelberg Materials marks autonomous haulage milestone

by Adam Daunt
January 15, 2026

Heidelberg Materials has revealed a successful collaboration at its Lake Bridgeport quarry in Texas with Pronto.ai.   The company has applied...

Read our magazine

Join our newsletter

Aggregates Business is the go-to source for all of your up-to-date news and views on the European, American, Asian, African and Middle Eastern aggregates and linked building materials sectors.

Subscribe to our newsletter

About us

  • About
  • Advertise
  • Subscribe
  • Latest Magazine
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
    • Americas
    • Europe
    • Rest of World
  • Features
  • Products
  • Events
  • Videos

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
    • Americas
    • Europe
    • Rest of World
  • Products
  • Features
  • Categories
    • Ancillary Equipment
    • Asphalt Plants, Equipment & Applications
    • Auctions, Used Equipment, Rental & Finance
    • Breaking, Drilling & Blasting
    • Concrete Plants, Equipment & Applications
    • Crushing Static & Mobile
    • Dewatering Pumps
    • Loading, Hauling & Excavation
    • Quarry Products
    • Screening Static & Mobile
    • Washing & Water Management
    • Wear Parts & Maintenance
  • Latest Magazine
  • Events
  • Videos
  • About
  • Advertise
  • Subscribe
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited