• About
  • Subscribe
  • Advertise
  • Contact
Tuesday, July 15, 2025
Newsletter
SUBSCRIBE
  • News
    • Americas
    • Europe
    • Rest of World
  • Products
  • Features
  • Categories
    • Ancillary Equipment
    • Asphalt Plants, Equipment & Applications
    • Auctions, Used Equipment, Rental & Finance
    • Breaking, Drilling & Blasting
    • Concrete Plants, Equipment & Applications
    • Crushing Static & Mobile
    • Dewatering Pumps
    • Loading, Hauling & Excavation
    • Quarry Products
    • Screening Static & Mobile
    • Washing & Water Management
    • Wear Parts & Maintenance
  • Latest Magazine
  • Events
  • Videos
No Results
View All Results
  • News
    • Americas
    • Europe
    • Rest of World
  • Products
  • Features
  • Categories
    • Ancillary Equipment
    • Asphalt Plants, Equipment & Applications
    • Auctions, Used Equipment, Rental & Finance
    • Breaking, Drilling & Blasting
    • Concrete Plants, Equipment & Applications
    • Crushing Static & Mobile
    • Dewatering Pumps
    • Loading, Hauling & Excavation
    • Quarry Products
    • Screening Static & Mobile
    • Washing & Water Management
    • Wear Parts & Maintenance
  • Latest Magazine
  • Events
  • Videos
No Results
View All Results
Home Features Safety record set at Cemex quarry

Safety record set at Cemex quarry

by Staff Writer
March 30, 2012
in Features
Reading Time: 6 mins read
A A
Share on FacebookShare on Twitter

Cemex UK's Barrington quarry and cement plant is a record breaker when it comes to safety. Claire Symes reports. Achieving zero lost time accidents is a target for almost every quarry operator in Europe but reaching this benchmark calls for continual focus and vigilance. One site that appears to have the right ingredients is Cemex UK's Barrington quarry and cement works in Cambridgeshire.

Cemex UK’s Barrington quarry and cement plant is a record breaker when it comes to safety. Claire Symes reports

Achieving zero lost time accidents is a target for almost every quarry operator in Europe but reaching this benchmark calls for continual focus and vigilance. One site that appears to have the right ingredients is Cemex UK’s Barrington quarry and cement works in Cambridgeshire.

In 2007 the site celebrated a new company record, with four years without a lost time injury and was presented with a special award to mark the occasion. The operation was presented with the Cemex safety sword – awarded annually since 1966 – for the best safety performance across the company’s businesses in Europe, Middle East, Africa, Asia and Australia.

In fact, the site has only had one lost time injury in the last eight years but, according to plant director Philip Baynes-Clark, the site’s safety record is no accident. “The site has had a good history of safety but that can change overnight and there is a real need to continually drive development in order to maintain the record,” he said.

The Barrington site has been producing cement since 1927 and the existing 1963 kiln has undergone a number of upgrades to give the site a capacity of 265,000tonnes of clinker and 285,000tonne of cement each year. Around 99% of the materials used in the cement works are provided from the adjacent quarry, which extracts up to 400,000tonnes of chalk and clay each year.

“The plant is not Cemex’s largest one in the UK but the kiln is the longest at 136m. Refinements and automation are enabling it to work at 25% above its design capacity at 850tonnes per day,” explained Baynes-Clark. “The plant is a wet process facility and we use several alternative fuels to bring the operating costs in line with more modern dry process operations.” The cement plant and quarry has a 70-strong workforce, which although is not as large as some cement plants, still requires significant input to ensure training and housekeeping is up to date.

The training and initiatives introduced at Barrington have helped it to earn outside recognition with three consecutive top safety awards from the UK’s Royal Society for the Prevention of Accidents and a clean bill of health from a Health and Safety Executive inspection last year. The site is also the first within Cemex to achieve HPR status through insurance company FM Global which means the site represents a low accident risk to both assets and people.

Learning process

While the site has a good record, not only has it been achieved through training but also through learning from mistakes made both at Barrington and at other similar sites.

“The last lost time injury at Barrington happened about eight years ago,” explained Barrington safety manager Tom Gemmel. “We used to have a train system for bringing material from the quarry into the cement side of the operation and the accident occurred during application of the manual brake. The operative tried to apply the brake stick but it slipped and he was hit in the face and needed to take a day off work to recover.

“After the incident we reviewed the system and decided to remove the railway and move to using articulated dump trucks to transfer material from the quarry to the raw plant. The incident itself highlighted an issue with potential wear and the danger of distraction during the braking process, but there were also other potential issues with the system, such as the difficulty in finding spares, the high voltage cables needed for power and the risk of wagon derailment.” According to quarry manager John Drayton, the changeover to using the Volvo A30 ADT has been very successful in both improving safety and efficiency.

Key improvements

While the site has clearly achieved a high level of safety, Baynes-Clark and his team started work on implementing a number of key improvements last year to ensure continued safe operation.

“One of the things we looked at in-depth was housekeeping and maintenance,” said Baynes-Clark. “In one part of the site we had a compound where old and broken equipment was stored for spares but with up to 50 years worth of equipment in the area it was difficult to know what was there and to safely access it, so the area was cleared. The housing for the drag chain was also repaired with the missing panels replaced.

“With a focus on reducing the potential for slips, trips and falls, site paths are checked informally on a daily basis but on a formal basis every week. The top of the cement silo was also cleaned and is now done regularly – although it is out of sight, it shouldn’t be out of mind.” Barrington seems to have placed a real emphasis on taking care of the site and listening to workers’ suggestions for improvements in a bid to encourage employees to take responsibility for both the appearance and safety of their environments.

Other initiatives launched encouraged a reduction in manual handling wherever possible and introduction of the ‘get a grip’ campaign to ensure three points of contact when working at height. The result of this is that gas bottles for the laboratory are now located where the supplier can deliver directly and a fall arrest system is now fitted over the wash mill to prevent operatives swinging and injuring themselves.

The focus on safety also extends to the health of employees. “We have to acknowledge that we have an ageing workforce here with the average age of employees being in their early 50s,” said Gemmel. “The risk of heart attacks for this age group is significantly higher so we have invested in automatic heart defibrillators with audible instructions to ensure medical help can be delivered quickly if needed. The equipment will not work if it detects a heart beat so no special training is needed to use it.

“We also encourage operatives to talk to their colleagues about health issues so there is greater awareness of any potential problems.” The site uses regular meetings with representatives from each department to ensure any potential health and safety problems are highlighted early and dealt with quickly. To keep track of progress the site has key performance indicators and these are updated weekly.

Next target

If the current working practices at Barrington help to keep its workers safe beyond November this year, the site will reach five years without a lost time accident. But when Baynes-Clark was asked if it is achievable, he said, “There is no room for complacency. Reaching the current record has called for site staff to continually focus on safety and one lapse could mean the count goes back to zero. It would be good to reach the five year figure but we need to take it one day at a time.”

Tags: Concrete Plants, Equipment & ApplicationsLoading, Hauling & ExcavationQuarry Products

Related Posts

Marshall Cleave in front of a Liebherr 945 excavator at Brookland's Goonbarrow site/ Image/Prime Global Publishing

A big Cornish win for Brookland with Liebherr GB

by Paul Argent
July 14, 2025

Liebherr Great Britain machines are well-proven winners for Brookland Sand & Aggregates in Cornwall, South West England. For many modern...

Paolo Zambianchi is Holcim Italy’s technical director of Aggregates & Ready Mix. Image/Holcim Italy

Paolo Zambianchi: Championing the new aggregate technology age

by Guy Woodford
July 14, 2025

A highly experienced aggregates industry professional whose expertise is drawn on by both Aggregates Europe (European Aggregates Association) and ANEPLA...

The first articulated hauler rebuild completed by Babcock in South Africa. Image/Volvo CE

Machine rebuilds – The African shift to circular construction

by Guy Woodford
July 8, 2025

As Volvo Construction Equipment (Volvo CE) dealer Babcock completes its first articulated hauler rebuild in South Africa, Anders Eriksson, service...

Read our magazine

Join our newsletter

Aggregates Business is the go-to source for all of your up-to-date news and views on the European, American, Asian, African and Middle Eastern aggregates and linked building materials sectors.

Subscribe to our newsletter

About us

  • About
  • Advertise
  • Subscribe
  • Latest Magazine
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
    • Americas
    • Europe
    • Rest of World
  • Features
  • Products
  • Events
  • Videos

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
    • Americas
    • Europe
    • Rest of World
  • Products
  • Features
  • Categories
    • Ancillary Equipment
    • Asphalt Plants, Equipment & Applications
    • Auctions, Used Equipment, Rental & Finance
    • Breaking, Drilling & Blasting
    • Concrete Plants, Equipment & Applications
    • Crushing Static & Mobile
    • Dewatering Pumps
    • Loading, Hauling & Excavation
    • Quarry Products
    • Screening Static & Mobile
    • Washing & Water Management
    • Wear Parts & Maintenance
  • Latest Magazine
  • Events
  • Videos
  • About
  • Advertise
  • Subscribe
  • Contact

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited