• About
  • Subscribe
  • Advertise
  • Contact
Saturday, June 14, 2025
Newsletter
SUBSCRIBE
  • News
    • Americas
    • Europe
    • Rest of World
  • Products
  • Features
  • Categories
    • Ancillary Equipment
    • Asphalt Plants, Equipment & Applications
    • Auctions, Used Equipment, Rental & Finance
    • Breaking, Drilling & Blasting
    • Concrete Plants, Equipment & Applications
    • Crushing Static & Mobile
    • Dewatering Pumps
    • Loading, Hauling & Excavation
    • Quarry Products
    • Screening Static & Mobile
    • Washing & Water Management
    • Wear Parts & Maintenance
  • Latest Magazine
  • Events
  • Videos
No Results
View All Results
  • News
    • Americas
    • Europe
    • Rest of World
  • Products
  • Features
  • Categories
    • Ancillary Equipment
    • Asphalt Plants, Equipment & Applications
    • Auctions, Used Equipment, Rental & Finance
    • Breaking, Drilling & Blasting
    • Concrete Plants, Equipment & Applications
    • Crushing Static & Mobile
    • Dewatering Pumps
    • Loading, Hauling & Excavation
    • Quarry Products
    • Screening Static & Mobile
    • Washing & Water Management
    • Wear Parts & Maintenance
  • Latest Magazine
  • Events
  • Videos
No Results
View All Results
Home News Tanzania: Selander Bridge Flyover signing

Tanzania: Selander Bridge Flyover signing

by Staff Writer
July 24, 2018
in News
Reading Time: 1 min read
A A
Share on FacebookShare on Twitter

Plans to decongest Dar es Salaam city in Tanzania have reportedly moved a significant step forward with the signing of the contract to build an ultra-modern Selander Bridge Flyover. The east African country’s government is said by national media to have signed a deal with South Korean firm GS Engineering & Construction Co Ltd for the delivery of of the three-year project. President John Magufuli and South Korean Prime Minister Lee Nak-yon witnessed the agreement signing between Tanzania Roads Agency (

Plans to decongest Dar es Salaam city in Tanzania have reportedly moved a significant step forward with the signing of the contract to build an ultra-modern Selander Bridge Flyover.

The east African country’s government is said by national media to have signed a deal with South Korean firm GS Engineering & Construction Co Ltd for the delivery of of the three-year project.

President John Magufuli and South Korean Prime Minister Lee Nak-yon witnessed the agreement signing between Tanzania Roads Agency (TANROADS) and the contractor at the State House in Dar es Salaam.

Dr Magufuli told Tanzanian media that the TZS 250bn (US$109.4mn) project will address chronic traffic jams on the old Selander Bridge, as well as beautify the city.

The works will also o attract strong demand for aggregates, cement and concrete from regional producers.

The bridge will cover 6.23 kilometres from Coco Beach area to Aga Khan Hospital, with a 1.03km-stretch passing over the Indian Ocean.

Related Posts

Betolar President and CEO, Tuija Kalpala. Image/Betolar

Betolar: Building the Future from Waste – High-Performing Green Cement Revolutionises the Industry

by Guy Woodford
June 13, 2025

Betolar's advanced metal separation technology enables the purification of industrial slag and mine tailings, achieving a 99 % metal yield...

U.S. city downtown construction works. Image/Fotoluminate Dreamstime.com

ABC: Trump administration fails to rescind Biden’s anti-merit labour mandate

by Guy Woodford
June 13, 2025

Associated Builders and Contractors (ABC) has responded to the announcement from the Office of Management and Budget that President Donald Trump’s administration...

CarbonCure Technologies

CarbonCure Technologies appoints new interim CEO

by Adam Daunt
June 13, 2025

Kristal Kaye has been confirmed as the interim chief executive of CarbonCure Technologies after initially joining the company in February...

Read our magazine

Join our newsletter

Aggregates Business is the go-to source for all of your up-to-date news and views on the European, American, Asian, African and Middle Eastern aggregates and linked building materials sectors.

Subscribe to our newsletter

About us

  • About
  • Advertise
  • Subscribe
  • Latest Magazine
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
    • Americas
    • Europe
    • Rest of World
  • Features
  • Products
  • Events
  • Videos

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
    • Americas
    • Europe
    • Rest of World
  • Products
  • Features
  • Categories
    • Ancillary Equipment
    • Asphalt Plants, Equipment & Applications
    • Auctions, Used Equipment, Rental & Finance
    • Breaking, Drilling & Blasting
    • Concrete Plants, Equipment & Applications
    • Crushing Static & Mobile
    • Dewatering Pumps
    • Loading, Hauling & Excavation
    • Quarry Products
    • Screening Static & Mobile
    • Washing & Water Management
    • Wear Parts & Maintenance
  • Latest Magazine
  • Events
  • Videos
  • About
  • Advertise
  • Subscribe
  • Contact

© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited