Installation of a wind pump at
The Poldaw Windpump was installed next to the quarry to help drain a restored area which has been returned to agricultural use. The 11m high unit works on a float system, pumping water from a lake next to the restored agricultural fields into new drainage dykes when the level is high and keeping water circulating when levels are acceptable.
Lafarge opted for the wind-powered solution as it was concerned about the high energy costs of a conventional solution.