The expansion will utilise state-of-the-art production technology resulting in higher fuel efficiency and improved productivity. The equipment scope includes a 5-stage ILC pre-heater with a Low NOx Calciner; three-pier kiln; FLSmidth Cross-Bar cooler; Duoflex burner; Pfister weighing and dosing systems; gas analysers and three Fuller-Kinyon pumps. An FLSmidth control system will ensure the most efficient operation.
“FLSmidth has a very strong local presence in the US, and the new production line will help Cemex keep pace with the rapidly growing cement demand from the oil and gas industry in the West Texas market,” says president of the Cement Division Per Mejnert Kristensen.
The order will be booked by the Cement Division and contribute beneficially to FLSmidth's earnings until late 2016.