Because of this, the Indian cement manufacturer has expanded the capacity of its factory in Wadi in the south Indian state of Karnataka to 13,000tonnes/day.
The
ACC’s decision is said to be the the result of the reliable performance of the bucket elevators supplied by beumer Group to the same client in the past with heights of 174m and 171m.
The enormous size of this system enables the flow rate of around 600tonnes/hour to be achieved, ensured by high-quality steel wire belts of particularly high strength.